Demolition scope of work includes removal and disposal of concrete bollards and foundations, asphalt pavement, vehicle barrier and appurtenances, concrete barrier foundation, traffic arm cabinet and foundation, concrete curb and gutter, 2′ wide concrete gutter, crosswalk pavement markings, gate operator, support posts chain, trench drain and foundation, concrete sidewalk and base course, approximately 18 linear feet of 12″ HDPE storm drain pipe, and approximately 5 linear feet of 4″ PVC roof drain pipe.
Transportation scope of work includes installation of crash-rated wedge vehicle barriers (ASTM F2656 M50/P1 compliant, and 8’ model), traffic arm (20’ length), and barrier control panel.
Site/Civil scope of work includes installation of concrete curb and gutter, reinforcing steel for barriers, pavement (asphalt, concrete), 4” PVC vehicle barrier drain, trench drain, in-line catch basin, bollards, stop sign, and pavement markings.
Electrical scope of work includes installation of vehicle detection loop, 15” junction box, sensors and controls, power for electric drive, electrical control box, wire and conduit for barrier system.